Table 1.

Turnaround time for diagnosis before and after on-site testing

Turnaround time, wkBefore on-site testing (N = 15)After on-site testing (N = 15)
Mean 9.20 2.67 
Standard deviation ±6.7 ±3.8 
Range 1-22 1-16 
Turnaround time, wkBefore on-site testing (N = 15)After on-site testing (N = 15)
Mean 9.20 2.67 
Standard deviation ±6.7 ±3.8 
Range 1-22 1-16 

P = .006.

Close Modal

or Create an Account

Close Modal
Close Modal